---
config:
flowchart:
defaultRenderer: 'elk'
subGraphTitleMargin:
bottom: 25
---
graph TB
%% flowchart
subgraph "WP4 (Architecture)"
Proposal -- Discuss --> Review
Review -- Rejected --> Proposal
Review -- Approved --> WBCS
end
subgraph "Participants from WP2, WP3 and WP4"
Implementations["Implementations
(wallets, issuers, verifiers)"]
end
subgraph "Testing Group"
ITB["ITB"]
end
WBCS -- "Guiding" --> Implementations
WBCS -- "Configure" --> ITB
Implementations -- "Test" --> ITB
Anyone -- "Create/adapt" --> Proposal
SpecEfforts["Specification efforts"] -- "New wallet interface definitions" --> WBCS
TestDev["Test development"] -- "New version test cases" --> ITB
1 WE BUILD Conformance Specifications (WBCS)
1.1 About
The WE BUILD Conformance Specifications (WBCS) define how WE BUILD participants implement wallet interfaces and communication protocols between issuers, wallets, and relying parties. They ensure interoperability and conformance by translating ADR decisions into precise implementation requirements.
The ITB will be based on the WBCS as a starting point. The test suites in the ITB are relying predominantly on the WBCS.
1.2 Contributing
The Architecture group define the WBCS, with help from all implementing participants. Propose new WBCSs using the template.
1.3 CS Process Summary for WE BUILD Large Scale Pilots (LSPs)
1.3.1 Approved WBCS
1.3.2 Published WBCS
| WBCS # | WBCS Title | Version | Maturity |
|---|---|---|---|
| CS-001 | Credential Issuance | 1.5 | Approved |
| CS-002 | Credential Presentation | 1.3 | Approved |
| CS-003 | Remote Qualified Signing with Wallet Units | 1.2 | Approved |
| CS-004 | Individual Wallet Unit Attestation (WUA) Lifecycle | 1.2 | Approved |
| CS-005 | Business Wallet Unit Attestation (BWUA) Lifecycle | 1.1 | Approved |
| CS-006 | Issuance of Relying Party Access and Registration Certificates | 1.1 | Approved |
| CS-007 | Credential Presentation and Issuance via the Digital Credentials API | 1.0 | Pre-flight |
| CS-010 | Attestation Revocation Mechanism | 1.1 | Pre-flight |
| CS-012 | SCA Attestations for Payment and Risk-based Authentication (TS12 Profile) | 1.2 | Pre-flight |
| CS-013 | Relying Party Intermediaries | 1.0 | Pre-flight |
| CS-015 | EBW–QTSP WMP Interface | 1.0 | Approved |
| CS-016 | Inter-QTSP Message Relay (QERDS AS4) | 1.0 | Approved |
1.3.3 WBCS Under Development
Links go to the draft PR where one exists, otherwise to the issue.
| WBCS # | WBCS Title | Status | Priority | Needed by |
|---|---|---|---|---|
| CS-011 | Remote QESeal Creation | 🟡 Drafting | Must-have | |
| CS-014 | Proximity / Offline Profile | 🔵 Investigating | Should-have | SC1 |
| CS-017 | Directory & Discovery (EDD) | 🟡 Drafting | Must-have | BU4, PA4, SC5 |
| CS-018 | Baseline Trust Validation | 🟢 In review | Must-have | All use cases |
| CS-019 | Support for Data Spaces | 🟡 Drafting | Should-have | SC2 |
| CS-020 | Document References, Linked Attestations and Evidence in (Q)EAAs | 🟡 Drafting | Should-have | SC1, SC5, PA3, PA4 |
| CS-XXX | RP-QERDS Interface | 🟣 Candidate | Low |
1.3.4 Status Definitions
| Status | Description |
|---|---|
| Not started | No active work has started yet. |
| Investigating | The topic is being investigated and potential approaches are being evaluated. |
| Drafting | The specification is being drafted. |
| In review | A concrete draft exists and is under review. |
| On hold | Work has been temporarily paused. |
| Dropped | The specification will not be taken forward. |